Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 04/29/2024 Category: 人行道上 Current Phase: Design Development
Construct multi-use path on Melbourne Street from U.S. 41 to Harborview 路.
Last Updated: 04/29/2024 Category: Sales Tax Funded Category: 人行道上 Current Phase: Planning and Project Approval
Rampart大街. Sidewalk phase 1Various Intersection Improvements
Last Updated: 04/29/2024 Category: 巷道 Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Manasota Key Sidewalk, Lighting & 景观
Last Updated: 04/29/2024 Category: 人行道上 Category: 景观 Category: 其他 Current Phase: Design Development
Gulf Boulevard Sidewalk, Lighting & 景观Last Updated: 04/29/2024 Category: 巷道 Current Phase: Design Development
吉尔特 Blvd roadway reconstructionLast Updated: 04/29/2024 Category: Sales Tax Funded Category: 人行道上 Current Phase: 建设
Marathon Boulevard PathwayWillmington Boulevard Sidewalk
Last Updated: 04/29/2024 Category: 人行道上 Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkSunset Boulevard East Sidewalk
Last Updated: 04/29/2024 Category: Sales Tax Funded Category: 人行道上 Current Phase: 建设
Sunset Boulevard East SidewalkRiverside Boat Ramp Replacement
Last Updated: 04/29/2024 Category: Parks And 娱乐 Current Phase: Design Development
As part of the CMP, 社区 Services is conducting structural assessments on all piers, 栈道, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.